Commercial energy compliance, envelope through acceptance

Office, retail, warehouse, hospitality, medical and mixed-use — NRCC documentation coordinated with the acceptance testing your project will need before occupancy.

Three compliance domains, one submittal

Nonresidential compliance splits into envelope, mechanical and lighting, each with its own documentation and its own opportunities to fail plan check independently of the others. Indoor and outdoor lighting are treated separately, and process loads apply to specific occupancies.

Tenant improvements are their own discipline. The scope of what triggers compliance in a TI is frequently misjudged — sometimes far wider than the team expected, occasionally narrower, and either error is expensive.

Acceptance testing is not optional

This is where nonresidential projects most often lose weeks. Lighting controls and mechanical systems require acceptance testing before a certificate of occupancy is issued, performed by appropriately certified technicians and documented on the NRCA forms.

Because it happens at the very end, it is routinely left unscoped until the project is already trying to close out. We identify the required acceptance tests at the documentation stage and schedule them into the programme instead. More on acceptance testing →

Project types we handle

  • Office and professional
  • Retail and restaurant
  • Warehouse and distribution
  • Hospitality and hotel
  • Medical and dental
  • Mixed-use podium
  • Tenant improvements
  • Shell and core
  • Light industrial
  • Educational and institutional
  • Refrigerated and cold storage
  • Self-storage

Nonresidential quoting

Priced from the drawings rather than a rate card — scope varies too much for a fixed list to be honest.

Send us the architectural set, plus mechanical and electrical if they exist, and we will come back with a fixed price covering documentation and the acceptance testing scope your project will require.

  • Fixed price before we start
  • Acceptance testing scoped at design stage
  • Plan-check corrections included
  • Lender and landlord documentation formats
Send drawings for a quote

Need a permit-ready report this week?

Same-day reports available. Send the plans, tell us the deadline, and we will work to it.

Call Text Send Plans