Residential Title 24 Reports (CF1R)
Certificate of Compliance documentation for new single-family construction, modelled to the 2025 Energy Code using CEC-approved compliance software.
What's included →2025 Energy Code · effective January 1, 2026
Permit-ready energy compliance reports, ECC field verification and acceptance testing for projects anywhere in California. Modelled to the current code cycle and your exact climate zone — with plan-check corrections handled at no extra charge.
Plan check deadline today? Say so when you send the plans and we will turn it around the same day.
Priced from the drawings, confirmed in writing, back within the hour.
Full compliance scope
Most consultants hand you a CF1R and disappear. Compliance actually ends at final inspection — so we scope the verification at the same time as the report.
Certificate of Compliance documentation for new single-family construction, modelled to the 2025 Energy Code using CEC-approved compliance software.
What's included →Remodels, additions and alteration-only permits, including the cases where existing-plus-addition modelling produces a materially better result than treating the addition alone..
What's included →Accessory and junior accessory dwelling units, detached and attached, including conversions.
What's included →Low-rise and high-rise multifamily under the 2025 Energy Code, which now separates multifamily requirements from single-family in ways that catch a lot of teams out..
What's included →Office, retail, warehouse, hospitality, medical and mixed-use.
What's included →Certificate of Installation and Certificate of Verification work performed by raters certified through a CEC-approved ECC-Provider and registered with an approved data registry..
What's included →Nonresidential acceptance testing for lighting controls, mechanical systems and controls — the step that most often holds up a certificate of occupancy because nobody scoped it at design stage..
What's included →PV sizing and battery storage documentation, plus the electric-ready provisions the 2025 Energy Code expanded.
What's included →The green building standards that sit alongside Part 6 and are frequently forgotten until plan check asks for them.
What's included →Already have a report and a correction letter? Send both.
What's included →ASHRAE Level I and II audits, utility benchmarking and AB 802 building energy use disclosure for owners with reporting obligations or capital planning to do..
What's included →ENERGY STAR, DOE Zero Energy Ready Home and local reach-code compliance for teams targeting more than the statutory minimum — increasingly a condition of local approval rather than a marketing choice..
What's included →The 2025 Energy Code
If your permit application was filed on or after that date, you are on the new cycle — regardless of when the plans were drawn. Designs that complied comfortably last year frequently do not now.
The date that governs is your permit application date. Not the design date, not the construction start. Tell us which it is and we model to the right cycle — getting this wrong is the single most expensive mistake we see, because it means a full remodel of the compliance approach after rejection.
California has 16 building climate zones, assigned by ZIP code — not by city or county. Los Angeles alone spans several. The zone determines every prescriptive requirement and every performance trade-off available to your design.
We confirm yours from the project address at intake rather than assuming from the city name. It is a common source of rejected reports.
If your CF1R relies on a measure requiring ECC verification and nobody scoped the testing, you will not get final sign-off — and you will find out at the worst possible moment. We flag every verification your design triggers when we issue the report.
ECC field verification →How it works
PDF floor plans, elevations, window and door schedules, and a mechanical schedule if you have one. Plus the project address and permit application date. Hand sketches work for small projects.
Climate zone confirmed from the address, compliance path chosen, and any ECC verification your design will trigger identified up front. Fixed price in writing before we start.
Modelled in CEC-approved compliance software and registered where registration is required. Same-day reports available — tell us the deadline and we work to it.
If plan check comes back with corrections on our work, we handle them at no charge. When construction reaches the verification stage, our ECC-Raters complete the field testing and registration.
Email drawings to reports@calititle24.com, or start here and we will reply with an upload link.
Statewide
Documentation is produced remotely, so where your project sits has no effect on turnaround. Field verification is scheduled regionally.
Common questions
The 2025 Energy Code took effect on January 1, 2026, and it applies based on when the permit application was filed — not when construction starts and not when the plans were drawn. If your application was submitted on or after that date, you are on the 2025 Energy Code. Projects with applications filed before it remain on the previous cycle. This catches teams out constantly on long-running projects, so tell us your application date when you send plans and we will model to the correct cycle.
Three things matter most in practice. The code expanded heat pump requirements for newly constructed residential buildings, pushing heat pump space and water heating into the baseline rather than treating it as an alternative. It broadened electric-readiness provisions, so buildings that install gas equipment now have to be wired and spaced for later electric replacement. And it strengthened ventilation requirements. Multifamily requirements also continue to diverge from single-family in ways that catch design teams out. The practical effect is that designs which complied comfortably under the prior cycle frequently do not any more.
They are the three stages of the residential compliance chain. The CF1R is the Certificate of Compliance — the design-stage document we produce from your plans and submit with the permit application. The CF2R is the Certificate of Installation, completed by the installing contractor to confirm what was actually built. The CF3R is the Certificate of Verification, issued by a certified ECC-Rater after field testing. Where measures require ECC verification, all three must be registered with an approved data registry before final sign-off. Nonresidential projects use the parallel NRCC, NRCI and NRCA series.
It depends on the measures your design relies on for compliance, which is exactly why the report and the testing should be scoped together. Common triggers include ducts located outside conditioned space, refrigerant charge verification on split systems, quality insulation installation, high-performance attics and walls, whole-house fans and various ventilation measures. ECC-Raters are certified through a CEC-approved ECC-Provider and their results are registered with an approved data registry. If your CF1R calls for a measure requiring verification and nobody performs it, you will not get final sign-off.
Yes, for Title 24 compliance purposes. Effective 1 January 2026, alongside the 2025 Energy Code, the California Energy Commission replaced the field verification and diagnostic testing portion of the HERS Program with the Energy Code Compliance (ECC) Program. HERS Raters became ECC-Raters, HERS Providers became ECC-Providers, and the ‘HERS Feature Summary’ on compliance documents is now the ‘ECC Feature Summary’.
Two things are worth knowing. First, the testing itself has not changed — duct leakage, blower door, refrigerant charge, airflow and QII are the same procedures. Second, HERS has not disappeared: whole-house HERS ratings and home energy audits continue under the separate HERS Program, and compliance documentation produced under earlier code cycles will still display ‘HERS’. Only 2025 Energy Code documentation shows ‘ECC’. If someone on your project still says HERS, they almost certainly mean ECC verification.
Same-day reports are available. Send complete plans and tell us the deadline — if it is today, say so and we will work to it. Same-day expedite is priced up front at $95, never invented when you are desperate.
What actually slows a report down is almost never the modelling; it is incomplete drawings. Window schedules, insulation values, equipment efficiencies and orientation are the four things most often missing, and we will tell you within the business hour if any of them are absent.
Same-day reports available. Send the plans, tell us the deadline, and we will work to it.